Este es el sitio web de ENTRENAMIENTO.

Para obtener información actualizada, visite detroitmi.gov

Virginia Park Streetscape

The City of Detroit will be working on the Virginia Park Streetscape Project in the start of the Summer 2025.

What Changes will Happened?

The Virginia Park Road Reconstruction project is a curb-to-curb reconstruction of the historic 30-foot-wide road from John C. Lodge Freeway to Woodward Ave. The road itself is characterized by its original brick paver surface and stone curbs which will be replaced. Additional improvements of strategically target areas could include repair of worn concrete sidewalk and driveway approaches that front the street, replacement of several noncompliant ADA crosswalk ramps, new shade street trees, and minimal upgrades to existing site furnishings. The estimated construction cost for the project is $5,278,100 with construction starting on the Summer of 2025 to be completed late Fall 2025.

 

01.21.2025 COO Meeting (2) Presentation: Virgina Park (2).pdf
08.13.2024 COO Meeting (1) Presentation: Virgina Park (1).pdf

Where?

Virginia Park Road (John C. Lodge Freeway to Woodward Ave.)

Virginia Park Streetscape Section

Questions?

Contact: Dolin Diaz

email: [email protected]