تصريح مرجل
تعلم كيفية تقديم طلب للحصول على تصريح المرجل.
للمزيد من المعلومات قم بزيارة:
جهات الاتصال
Frequently asked questions about boiler permit
Contractors can request an inquiry with
The BSEED inspector / supervisor will review the facilities and repairs plans to ensure proper application of the code requirements.
The Boiler Division performs two (2) types of inspections, and the basic requirements for each are listed below.
Annual: required for installations and high pressure repairs (internal and external), low pressure of more than 300 square feet (internal and external) and all equipment.
Biennial: required for pressure vessels that exceed 30 pounds per square inch (psi).
Please note: the basic requirements are not limited to the above information, since an inspector can identify additional requirements in the inspection report.
مستندات
BSEED Boiler Fee Schedule